Impact-protection decisions
CompareQuestionEvidence
What is required?Address-specific official determinationApplicable wind zone, debris region, design pressure, building conditions, and accepted protection method
What was tested?Product approval or test recordExact series, size, operation, glass, frame, mullion, anchorage, and installation limits
What will be installed?Opening schedule and installation detailSubstrate, fasteners, edge distances, flashing, sealant, trim, and inspection access
What is the alternative?Authority-accepted optionRated shutter or other approved opening-protection system when permitted

Do not confuse glass categories

Safety glazing addresses injury risk from breakage in specified hazardous locations. Windborne-debris protection addresses a different test and building-performance context. A product may need to satisfy more than one requirement, and one label should not be substituted for another.

  1. Verify the address

    Use the current official authority and property-specific design information.

  2. Match the approval

    Confirm that the exact product, size, operation, and anchorage are within the approved record.

  3. Verify the opening

    Check substrate, condition, dimensions, mullions, structure, water management, and finish.

  4. Preserve inspection evidence

    Keep labels, approvals, invoices, photographs, and permit or inspection records when applicable.